


Most people don't think much about what goes under a shed. They focus on the building itself - the size, the doors, the style. But the pad underneath is what determines whether that shed is still sitting level and draining properly five or ten years from now. Skip this step, and you're setting yourself up for headaches.
We got called out to prep a 24x24 shed pad for a client, and this is exactly the kind of work we love doing. It's not glamorous, but it matters. The area needed to be stripped down, graded out, and brought to a flat, compacted surface before anything else could happen. That's where our light excavation work comes in.
Using our Takeuchi mini excavator, we were able to get into the backyard space without tearing up the surrounding lawn any more than necessary. That's one of the big advantages of using compact equipment on residential jobs - we get the work done without leaving a mess behind. The bucket work on a pad like this has to be precise. You're not just moving dirt, you're establishing the grade.
A shed that sits on a properly prepped pad will stay level, shed water away from the base, and hold up through freeze-thaw cycles without shifting. One that gets dropped onto unprepared ground? It'll rack, the doors won't swing right, and moisture will work its way in from below. The prep work is everything.
We handle shed pad prep, grading, and light excavation for all kinds of residential projects. If you've got a structure going in and you want the foundation done right from the start, we're the crew to call.